叶巴滩水电工程施工初期导流标准优选

    Design of digitization technical scheme for Manwan Hydropower Station

    • 摘要: 叶巴滩水电工程规模巨大,施工难度高,采用科学的方法优选出安全、经济、合理的施工初期导流标准意义重大。结合该工程施工期特点,基于风险分析理论,从历史洪水、实测洪水、初期导流风险率、风险决策等多方面展开了系统分析。结果表明,叶巴滩水电站施工初期导流标准选择20 a一遇洪水是科学合理的。分析方法可为高拱坝施工初期导流标准的优选提供借鉴。

       

      Abstract: In order to solve the problems of repeated signal acquisition and signal electromagnetic interference in traditional large and medium hydropower station, the digitization renovation should be realized. We discussed 3 basic characteristics of the digitization hydropower station: primary device intelligence, secondary equipment cyberization and communication standardization. On the basis of the study on key technologies such as integration platform and digitization of automation component, we designed the digitization solution of Manwan Hydropower Station. The research shows that the digital hydropower station is completely feasible in technology, and the digital reformation will improve the reliability of equipment, significantly enhance the economic operation level and benefits of the power plant.

       

    /

    返回文章
    返回