葛洲坝电站运行对中华鲟产卵场水流条件的影响

    Influence of different operation modes of Gezhouba Hydropower Station on flow condition of Chinese sturgeon′s spawning ground

    • 摘要: 葛洲坝修建后,中华鲟被迫于每年10~11月在葛洲坝下游产卵繁殖。但三峡水库蓄水后,中华鲟产卵期,葛洲坝来水量减小,使中华鲟产卵场水流条件发生变化,从而对其自然繁殖产生不利影响。通过建立中华鲟产卵场二维水动力模型,在探讨中华鲟产卵场适宜水流速、流量和葛洲坝机组增容的基础上,提出2种葛洲坝水电站生态优化调度方案。结果表明:改变发电流量泄流位置将一定程度改善中华鲟产卵场水流条件,但增加机组额定发电流量对改善产卵场水流条件作用有限。

       

      Abstract: The impoundment of Three Gorges Reservoir causes a large reduction of inflow to Gezhouba Reservoir in October and November and further significantly changes the hydrological and hydrodynamic conditions of Chinese sturgeon′s spawning ground in the downstream of Gehouba reservoir dam, which have adverse effects on their natural reproduction. On the basis of discussing suitable flow and velocity of Chinese sturgeon′s spawning ground and considering the influence of power generation flow increasing of Gezhouba Hydropower Station, a two-dimensional hydro-dynamical model was established, further two optimal ecological dispatching solutions were explored. The results show that changing the position of power discharge is beneficial to improving the flow condition of Chinese sturgeon′s spawning ground in a certain extent, while increasing the generating unit rated flow is hardly effective.

       

    /

    返回文章
    返回