江湖关系变化条件下洞庭湖区撇洪工程对策研究

    Research and countermeasures on flood diversion project in Dongting Lake area under changed river-lake relationship

    • 摘要: 撇洪工程为洞庭湖区特别是四水尾闾地区重要的排涝设施之一。由于受江湖关系的变化和人类活动的影响,长江三口以及洞庭湖区泥沙淤积严重,导致洞庭湖区同流量下洪水位抬高、高洪水位持续时间延长;致使洞庭湖区撇洪工程自流外排机会减少、运行效率降低,撇洪河堤险情频繁出现,严重影响到了撇洪工程的运行安全。西洞庭湖区的常德市冲柳高水撇洪工程在洞庭湖区撇洪工程中具有一定的代表性,以该撇洪工程为实例,通过对比不同年代(20世纪70年代和21世纪初)的江湖关系变化条件下的撇洪工程运行效果,对其撇洪效果产生差异的原因进行了分析研究。根据分析结果,提出了适宜的应对措施及方案,即在撇洪工程出口处配套建设排涝泵站,同时,对该改造方案的排涝效果进行了论证和评估。研究成果可对类似地区排涝工程的规划设计提供借鉴和指导。

       

      Abstract: Flood diversion project is one of the most important drainage facilities in Dongting Lake area, especially in the estuary areas of the Xiangjiang River, Zishui River, Lishui River and Yuanshui River into the Lake. Due to the impacts of the changed relationship between Yangtze River and Dongting Lake and human activities, the sediment deposition is getting more serious in the three distributaries of Changjiang River to Dongting Lake and the Dongting Lake area, leading to a rise in flood level under the same flows, longer duration at high flood stage and further a reduction in gravity discharge and running efficiency of the flood diversion projects and more frequent risk occurrence of flood diversion embankment, which seriously impacts the operational safety of the project. This paper takes typical Chongliu diversion project for high water level as a study case to compare the running effects of the project under different the river-lake relationship in the 70's of 20th century and the beginning of the 21st century and the difference causes. According to the analysis results, the corresponding countermeasure of constructing a pump station for the flood diversion project is put forward. For the pump station, the flood drainage effect is assessed.

       

    /

    返回文章
    返回