乌东德水电站左岸防渗帷幕布置方案优化研究

    Optimization of anti-seepage curtain layout for left bank of Wudongde Hydropower Station

    • 摘要: 乌东德水电站在可研阶段设计的是左岸防渗帷幕穿过厂房上游侧后,向上游转折接Pt2-12y相对隔水层,防渗依托可靠,但防渗线路长、工程量大,且上接线路穿过溶蚀发育的灰岩地层,灌浆施工难度较大。根据施工期开挖揭露的地质条件和专项补充勘探成果,开展了防渗依托层论证、三维渗流计算分析、结构稳定安全复核等研究,将左岸防渗帷幕布置调整为下接Pt2-12y弱透水层,缩短帷幕线路长度达329 m,效益显著。研究成果对同类工程防渗依托层的选择及帷幕布置优化具有较好的参考意义。

       

      Abstract: The original anti-seepage curtain on the left bank riverbed of the Wudongde Hydropower Station was designed to pass through the upstream side of the factory buildings, and to turn upstream to the relative waterproof layer of Pt2-12y. For this layout, the anti-seepage effect is reliable, but the anti-seepage line is long, and further the upper connection section passes through the dissoluble limestone stratum, so grouting construction is more difficult. According to the geological conditions exposed during the excavation and the special supplementary exploration results, the studies on the anti-seepage backing layer, the three-dimensional seepage calculation and the structural stability and safety review were carried out. Based on the analysis results, the arrangement of the anti-seepage curtain on the left bank was adjusted to the Pt2-12l weak permeable layer, so the curtain length was reduced to 329 m. The research results can be a good reference for the selection of anti-seepage backing layer and the optimization of curtain layout in similar projects.

       

    /

    返回文章
    返回