盾构隧道开挖诱发邻近桩周土体变形试验研究

    Model test on deformation of adjacent pile foundation caused by excavation of a shield tunnel

    • 摘要: 针对超大直径隧道开挖时邻近桩基变形观测困难的问题,提出了超大直径隧道侧穿桩基的透明土试验方案。采用熔融石英砂搭配正十二烷和白油混合溶液作为孔隙溶液配置透明土,并结合光学观测系统及PIV处理系统,对盾构隧道开挖引起的邻近桩周土体位移变化规律进行分析,获得不同工况下桩周土体位移场。试验结果表明:随着桩隧间距的增大,隧道开挖对桩基附近的土体扰动会越来越小,当桩隧距离达1.5倍隧道直径时,桩基所受的影响达到临界值;随着桩长的增大,桩侧土体的竖向位移呈现抛物线形式,先增大后减小,桩侧土体的水平位移由桩基上部向隧道方向倾斜变为桩基上部和隧道范围内的土体向隧道方向倾斜;开挖面距离桩基越近,开挖对桩周土体位移的影响越剧烈。

       

      Abstract: Aiming at the difficulty of deformation observation of adjacent pile foundation during excavation of ultra-large diameter tunnels, a transparent soil test scheme was proposed for ultra-large diameter tunnels going through pile foundation laterally.Fused quartz sand, as well as mixed solution of n-Dodecane and white oil were used as pore solution to prepare transparent soil, and optical observation system and PIV processing system were combined.The soil displacement around pile caused by shield tunnel excavation was analyzed and the soil displacement fields around pile under different conditions were obtained.The test results show that with the increase of the distance between piles and tunnels, the excavation disturbance to the soil near the pile foundation will become smaller and smaller.When the distance between piles and tunnels reaches 1.5 times the tunnel diameter, the influence on the pile foundation will reach the critical value.With the increase of pile length, the vertical displacement of soil on the pile side shows a parabolic form, first increasing and then decreasing.With the increase of pile length, the horizontal displacement of soil on the side of pile will change from soil of upper pile part leaning towards tunnel to soil of upper pile part together with soil of tunnel side all leaning towards tunnel.The closer the excavation face is to the pile foundation, the more severe the influence of excavation on the soil displacement around the pile.

       

    /

    返回文章
    返回